Projects tagged with Technical
-
Resolution Architecture | Pewley Way, Guildford
Clay Tile Clad 2-Storey Extension Planning App
Tags Visuals, Technical
- RIBA Level: Part 2
- Pieces: 14
- 6
- 729
-
CSI King\'s College
Centre for excellence in palliative care, copyright LTS
Tags Finishes, Detailing, Technical
- RIBA Level: Part 3
- Pieces: 11
- 1
- 291
-
SSAP Children\'s Centre
Children\'s Centre in Poplar, copyright LTS
Tags Detailing, Technical
- RIBA Level: Part 3
- Pieces: 8
- 1
- 66
-
New North Road
Mixed use residential, copyright LTS
Tags Finishes, Detailing, Tender, Technical
- RIBA Level: Part 3
- Pieces: 4
- 0
- 73
-
10 Northampton Square
Private Residential, copyright LTS
Tags Technical, Tender, Detailing, Lighting, Finishes
- RIBA Level: Part 3
- Pieces: 9
- 1
- 104
-
John Carne Salon
Salon, Wimbledon, copyright LTS
Tags Lighting, Detailing, Technical
- RIBA Level: Part 2
- Pieces: 8
- 0
- 44
-
Crematorium
This project sort to explore how the architecture itself informs, enhances and helps those in an emotional state or journey.
Tags Model Making, Modelling, Visuals, Detailing, Technical
- RIBA Level: Part 2
- Pieces: 16
- 2
- 205
-
Recording Studios, Wroclaw
2nd year diploma project. The design features both a wider urban plan for an area of Wroclaw, as well as a detailed design of a music rehearsal and recording complex. the differing characters of rehearsal and recording music (as opposed to a performance) were investigated. a more urban, demonstrative building was sought to house recording studios, traditionally a more introverted type of architecture. a semi-translucent glass screen encloses the various materially characterful and specific spaces of a recording and rehearsal complex. while the studios remain mostly private, a rehearsal hall for wroclaw’s philharmonic orchestra is faced by various ‘listening galleries’ where members of the public can listen in on the rehearsal, while only gaining oblique views of the performers.
Tags Hand Drawing, Modelling, Visuals, Technical, Masterplan
- RIBA Level: Part 2
- Pieces: 8
- 3
- 121
-
Advertising Agency
Asked to create a space of production and exchange, the project takes the immediate context of Stratford in the midst of the Olympic Games through the creation of a promoting platform for the event. The idea of passage to the new Olympic site is enhanced and multiplied to create a new circulation for the given exhibition space and offices.
Tags Hand Drawing, Modelling, Visuals, Detailing, Technical
- RIBA Level: Part 1
- Pieces: 8
- 1
- 88
-
Multifunctional Stadium, Glasgow
2007 - 2008
Tags Model Making, Landscape, Modelling, Visuals, Technical, Finishes
- RIBA Level: Part 1
- Pieces: 0
- 0
- 3
-
The Writers Institute
In the colourful and vibrant quarter of London; Aldgate East, a new centre of learning has been conceived by the architect. It appears brutalist in style and creation, however the center will spark a new style of learning, culminating in a successful exercise whereby impoverished participants will become successfully socially integrated with well to do citizens which currently reside in the City of London earning far greater salaries for the first time in history. Society will slowly change for the better.
Tags Masterplan, Technical, Visuals, Modelling, Finishes
- RIBA Level: Part 1
- Pieces: 6
- 1
- 132
-
The Symbiotic Office
Part II Diploma Project http://vimeo.com/42265311
Tags Lighting, Landscape, Computer Model, Finishes, Modelling, Visuals, Detailing, Technical, Interior, Facade
- RIBA Level: Part 2
- Pieces: 11
- 44
- 2007
-
WaterAid at Manchester Victoria Railway Station
Year 3 Final Studio Project
Tags Model Making, Modelling, Visuals, Technical
- RIBA Level: Part 1
- Pieces: 61
- 5
- 425
-
The HUB: A Joint Facility for the Liverpool Universities
A monument, a statement about the importance of higher education to the City of Liverpool and the presence there of its four Universities. It relates to the city and citizens of Liverpool and is central to the merging of Town and Gown.
Tags Physical Model, Technical, Visuals
- RIBA Level: Part 1
- Pieces: 8
- 1
- 86
-
Birmingham Markets
A detailed urban study of Birmingham\'s Historic food, markets and transport references. Warranting a market expansion in desirable areas to live.....
Tags Visuals, Technical, Hand Drawing
- RIBA Level: Part 1
- Pieces: 13
- 4
- 420
-
Plymouth Gateway Technology Report
Technology Report for Plymouth Gateway Project
Tags Technical, Detailing, Computer Model
- RIBA Level: Part 1
- Pieces: 21
- 0
- 176
-
Education Centre for Architecture and the Built Environment
This is a final Diploma Project at the University of East London. The project explores the role of education in regenerating post-industrial landscape
Tags Interior, Physical Model, Technical
- RIBA Level: Part 2
- Pieces: 27
- 0
- 371
-
Open Air Classroom - Bayards Hill Primary School
The project responds to the need for enhancing the under-used open space within the school grounds. Positioned separately from the main school compound, with the \'classroom\' building designed to be a educational and gathering space and a beacon both for the school and the local community. The adopted form minimises its footprint on land, expresses high environmental standards, improves site access and use patterns, thus, together with the new apple orchard, achieving high social value for the school and the surrounding area.
Tags Visuals, Technical, Hand Drawing
- RIBA Level: Part 1
- Pieces: 5
- 3
- 408
-
Saving Cities
Exercise aiming to investigate current approaches to shelter and reconstruction after a disaster and offer a number of considerations to be added to the so far disproportionately modest pool of knowledge about good practice in shelter and reconstruction in urban areas.
Tags Technical, Massing, Urban Planning
- RIBA Level: Part 2
- Pieces: 7
- 2
- 316
-
Studio Lamp
\"Elegance is hard-earned simplicity\" - Alain de Botton. Studio lamp designed and built by Rowan Morrice and Michael Soja Hoxbroe
Tags Interior, Lighting, Technical
- RIBA Level: Part 1
- Pieces: 5
- 0
- 68
-
Regional Seed Bank
Second Year Work @ Birmingham School of Architecture
Tags Computer Model, Masterplan, Technical
- RIBA Level:
- Pieces: 2
- 0
- 47
-
The Vapour Stand
Bandstand project, Leicester. Awarded 2nd place by the Normal Gill Charitable Trust in 2009. X. Manning, P. Sohi, A. Piechota.
Tags Technical, Computer Model, Competition
- RIBA Level: Part 1
- Pieces: 6
- 0
- 34
-
The Marionette Crematorium (portfolio excerpts)
DipArch - Year 1, semester 2 project. Omega. Crematorium & hanging chapel, challenging the mourner\'s mortality and reversing the minimalism of death.
Tags Modelling, Detailing, Technical
- RIBA Level: Part 2
- Pieces: 9
- 0
- 75
-
“Growing” Community Space (Group members: Kok Cin Lim, Philippa Shaw Carveth and Elzbieta Kaleta)
This project proposes transformation of London Zoo\'s car park into a community space for local people.
Tags Visuals, Technical, Computer Model
- RIBA Level: Part 1
- Pieces: 8
- 0
- 218
-
London\'s Floating Trees
This is a proposal for urban food production on canals in London.
Tags Technical, Urban Planning, Computer Model
- RIBA Level: Part 1
- Pieces: 14
- 0
- 206
-
Feminist Coffeehouse
Tags Physical Model, Visuals, Technical
- RIBA Level: Part 1
- Pieces: 8
- 3
- 173
-
Earthen Synapse (portfolio excerpts)
DipArch - Year 2, Sustainable Building: Performance & Design semester 2 project. Housing and allotment scheme bridging two neighbourhoods of Oxford.
Tags Detailing, Technical, Masterplan
- RIBA Level: Part 2
- Pieces: 13
- 0
- 277
-
RVC Equine Hospital
Royal Veterinary College, Potters Bar. Completed: 2010. Contract value: £2.5m (Traditional). RIBA stages E-F. Copyright ArchitecturePLB.
Tags Detailing, Tender, Technical
- RIBA Level: Part 3
- Pieces: 5
- 0
- 33
-
Gallery Apartments
Christchurch, NZ. Completed: 2007. Contract value: $11.7m NZD, (£6m) (Traditional). RIBA stages E-J. Copyright Wilson & Hill
Tags On-Site, Detailing, Technical
- RIBA Level: Part 3
- Pieces: 6
- 0
- 51
-
New Barn Farm
Private House including Barn Conversion, Alresford, Hampshire. Uncompleted. Contract value: £1.8m (estimated). RIBA stages A-F. Copyright DFD&CA
Tags Production Info, Detailing, Technical
- RIBA Level: Part 2
- Pieces: 4
- 0
- 65
-
Marriotts & Lonsdale School
New Build School (Stages D-K), £45m, D&B Contract under BSF, Hertfordshire, copyright architectureplb
Tags Interior, Production Info, Technical
- RIBA Level: Part 3
- Pieces: 3
- 0
- 28
-
32 Waiwetu Street
Private House, Waiwetu Street, Christchurch, NZ Uncompleted. Contract value: $1m NZD, (£0.5m) (Traditional) RIBA stages A-F. Copyright Wilson & Hill
Tags Envelope, Tender, Technical
- RIBA Level: Part 3
- Pieces: 3
- 1
- 63
-
MArch Project : Hotel for Murderers
A Hotel catering for Matadors, utilising the fallen Bulls\' blood as fertiliser to produce their meals. Further info : www.thomasgrayarchitecture.com
Tags Modelling, Visuals, Technical
- RIBA Level: Part 2
- Pieces: 20
- 1
- 183
-
Barbican-Unite
A customised accommodation helping interns to accept their placement without over stretching their credit account. Located at the heart of London, in
Tags Massing, Sketch, Technical
- RIBA Level:
- Pieces: 7
- 0
- 50
-
The Aquaponics Cliff Farm
Aquaponics farm and education centre. Utilises renewable technologies, passive design and closed-loop systems
Tags Hand Drawing, Modelling, Technical
- RIBA Level: Part 1
- Pieces: 12
- 2
- 287
-
27.5 SECS SPECTACLE OF COMMODITY ON THE WESTWAY
http://vimeo.com/44576289 This is a video created for my RIBA Part 1 review at the Architectural Association School of Architecture.
Tags Visuals, Technical, Computer Model
- RIBA Level: Part 1
- Pieces: 12
- 1
- 292
-
Previous Work Samples
Previous work prior to my third year
Tags Technical, Hand Drawing, Model Making
- RIBA Level: Part 1
- Pieces: 8
- 0
- 141
-
Plane Sailing
London Festival of Architecture
Tags Technical, Event
- RIBA Level: Part 1
- Pieces: 8
- 0
- 21
-
Train station technical report
The technical report that was produced in conjunction with the train station design project.
Tags Feasibility, Technical
- RIBA Level: Part 1
- Pieces: 21
- 0
- 89
-
New Poetry: a Library in Rome [second year project]
\"Poetry is not the books in the library... Poetry is the encounter of the reader with the book, the discovery of the book\" - Jorges Luis Borges
Tags Visuals, Physical Model, Technical
- RIBA Level: Part 1
- Pieces: 12
- 0
- 117
-
Sharanam, India
Sustainable community development in Tamil Nadu, India.
Tags Construction, On-Site, Technical
- RIBA Level: Part 2
- Pieces: 5
- 1
- 95
-
Tyne X Change
MArch Thesis project, a resolution to stimulate Newcastle\'s old maritime industry and to reconnect the area with Scandinavia and the Baltics. a Socio
Tags Visuals, Urban Planning, Technical
- RIBA Level: Part 2
- Pieces: 0
- 0
- 2
-
Avian Biotecture
My Concept is reproducing the natural food chain which has been broken due to increased popuation and urban development in the Wantsum Channel
Tags Interior, Detailing, Technical
- RIBA Level: Part 1
- Pieces: 5
- 0
- 263
-
Little Pink Protest
Combining forced Rhubarb, Almond Yogurt, Bees Honey and Lemon Juice made in 1 mans shed to create a hair dye leaving the people with a story
Tags Visuals, Detailing, Technical
- RIBA Level: Part 1
- Pieces: 4
- 0
- 350
-
Euphoric Ambiance
The concept surrounds that of smell and the different euphorias that are emmited through the natural substances. This reflects on the cycle of life in
Tags Detailing, Technical, Hand Drawing
- RIBA Level: Part 1
- Pieces: 5
- 0
- 175
-
Ministry for Social Rebirth
A tower for social rebirth. A place for people to re-engage in a socialist lifestyle.
Tags Modelling, Visuals, Technical
- RIBA Level: Part 1
- Pieces: 13
- 2
- 360
-
Solar Decathlon. Spain
Tags Modelling, Detailing, Technical
- RIBA Level:
- Pieces: 2
- 0
- 12
-
Condominium & Residential Masterplan
Part 2 work experience in Singapore
Tags Competition, Detailing, Technical
- RIBA Level: Part 2
- Pieces: 5
- 1
- 69
-
Pret-a-Porter
The brief was to design two porter’s lodges for the two entrances of the University of Bath. We were asked to make best use of the materials that we
Tags Technical, Physical Model
- RIBA Level: Part 1
- Pieces: 6
- 0
- 3
-
Visitor Centre
The brief was to design a visitor centre on a given site next to the Royal Crescent in Bath. The building required an exhibition hall, a lecture theat
Tags Technical, Computer Model
- RIBA Level: Part 1
- Pieces: 7
- 0
- 4
-
Architecture School
The brief was to design a new architecture building for the department on campus of University of Bath. The building required studios, crit and exhibi
Tags Technical, Computer Model
- RIBA Level: Part 1
- Pieces: 12
- 1
- 125
-
Final Degree Project for Spanish Bachelor\'s degree
An integral and sustainable system valued the spatial qualities of its location and led to spatial regeneration.
Tags Computer Model, Urban Planning, Technical
- RIBA Level: Part 2
- Pieces: 6
- 1
- 14
-
Extension, Norway
Design for an extension in Norway after a house fire. Along with the rehabilitation of the house, the extension will house the new kitchen.
Tags Stage C-D, Technical, Facade
- RIBA Level:
- Pieces: 5
- 0
- 7
-
Survey, Norway
Survey of a cluster of historical buildings in Norway dating from the 17th to the 19th century.
Tags Technical, Sketch
- RIBA Level: Part 1
- Pieces: 6
- 0
- 1
-
Ecology Center, Greenhead park, Huddersfield,UK
Tags Visuals, Technical, Masterplan
- RIBA Level: Part 1
- Pieces: 0
- 0
- 5
-
Container House
The Challenge of Compostition in a sloped Coastal Landscape
Tags Technical, Computer Model, Landscape
- RIBA Level: Part 2
- Pieces: 1
- 0
- 4
-
Hayes Bridge - Handrail
A live project designing a Handrail for a Bridge previously built by the COLAB group at Birmingham School of Architecture.
Tags Technical, Sketch, Physical Model
- RIBA Level: Part 1
- Pieces: 5
- 0
- 37
-
The Olympic Commerce Center
Countries accumulate and trade resources, as a result the cost of hosting the Olympics can be reduce instead of the onus being placed on one country
Tags Computer Model, Visuals, Technical
- RIBA Level: Part 1
- Pieces: 13
- 0
- 487
-
DPOD (Digital Preservation of Dartford)
Based in a future where the southeast of England is overcome by flooding the archives shown in the network grid below would be programmed according to
Tags Technical, Detailing, Visuals
- RIBA Level: Part 1
- Pieces: 23
- 0
- 259
-
PROJECT : GALEN
Rebooting Olympic Legacy: a school primed for kinaesthetic learners. Founded on neuro-science research: “cognitive sports increases blood flow to th
Tags Technical, Visuals, Envelope
- RIBA Level: Part 1
- Pieces: 11
- 0
- 90
-
A house for a human
Tags Technical
- RIBA Level: Part 1
- Pieces: 6
- 0
- 44
-
Synoptics 02
A history, which is deeply rooted in movement, is celebrated in the form of a kinetic archive where the public experiences a living collection.
Tags Visuals, Technical, Facade
- RIBA Level: Part 1
- Pieces: 10
- 0
- 58
-
Hackney Hooch
A bootleg vodka distillery set in the site of the former Hackney Allotments, before the Olympic Park was erected.
Tags Detailing, Technical
- RIBA Level: Part 1
- Pieces: 10
- 0
- 97
-
The Armstrong Institute
Located in Athens, this laboratory, headed by Lance Armstrong, is designed to detect the latest blood doping drugs before they reach the Olympics. How
Tags Visuals, Detailing, Technical
- RIBA Level: Part 1
- Pieces: 3
- 0
- 56
-
Centre for Paraplegic Rehabilitation
Blackfriars Road, Southwark, London ...”through sport, these people, whose lives have been traumatically changed, can have an outlet for their frust
Tags Technical, Visuals, Physical Model
- RIBA Level: Part 2
- Pieces: 16
- 0
- 53
-
Adaptive Architecture for Climate Change
A community adapting to future Extreme Darkness & Excess Choice
Tags Visuals, Computer Model, Technical
- RIBA Level: Part 1
- Pieces: 8
- 0
- 18
-
WikiHouse Oxford
In 2010 The Oxford Academy, a school for 11-18 year olds, engaged two architecture diploma students in a two-week design brief to generate ideas for a
Tags On-Site, Production Info, Technical
- RIBA Level: Part 2
- Pieces: 5
- 0
- 37
-
H3 Chisenhale
The project will help rebuild and to teach skills to unemployed individuals living in Tower Hamlets through the parameters of food and health.
Tags Visuals, Detailing, Technical
- RIBA Level: Part 1
- Pieces: 4
- 0
- 67
-
Queen Elizabeth Hospital: Copyright BDP
Approximately 18 months involvement as a part 1 student working in the GA team, predominantly dealing with stages E & F.
Tags Stage E-F, Detailing, Technical
- RIBA Level: Part 1
- Pieces: 7
- 0
- 23
-
Victoria Hospital: Copyright BDP
Approximately 6 months involvement as a part 1 student, predominantly dealing with stages E & F.
Tags Stage E-F, Detailing, Technical
- RIBA Level: Part 1
- Pieces: 3
- 0
- 4
-
BSF Selection: Copyright BDP
Approximately 12 months involvement on a selection of BSF schemes, from stages B to F
Tags Massing, Sketch, Technical
- RIBA Level: Part 1
- Pieces: 6
- 0
- 39
-
Bents Green BSF: Copyright BDP
12 months involvement on an SEN school in the Sheffield Green belt, within a new build, a 60\'s block renovation, and a C17th stone fronted coach hous
Tags Technical, Physical Model, Hand Drawing
- RIBA Level: Part 1
- Pieces: 20
- 0
- 43
-
Stonehaugh Stargazing Pavilion
Stonehaugh Stargazing Pavilion is a live build project designing and constructing a pavilion which celebrates the declaration of the Northumberland Da
Tags Technical, Competition, On-Site
- RIBA Level: Part 2
- Pieces: 6
- 0
- 2
-
60 Worship Street
Shoreditch, London. Completed: 2014. Contract Value: £1.2m. RIBA stages A-L. Copyright Paramount Architects
Tags Envelope, Facade, Technical
- RIBA Level:
- Pieces: 7
- 0
- 0
-
The Robot Revolution In Hamburg
A University for Robotic Construction & Digital Fabrication. The process of introducing Robots into the Construction Industry through education
Tags Urban Planning, Technical, Detailing
- RIBA Level: Part 1
- Pieces: 19
- 0
- 85
-
Bethnal Green Biofuel Kitchen
Urban agriculture and the exploration of microbial technologies and closed-loop systems to revitalise the London Fields area, by establishing value in
Tags Technical, Visuals, Computer Model
- RIBA Level: Part 1
- Pieces: 14
- 1
- 37
-
Functional Building Skin
Responsive modular facade using metal-chemistry interactions. Sustaining environmental control systems through passive power generation, and using an
Tags Technical, Detailing, Physical Model
- RIBA Level: Part 1
- Pieces: 7
- 0
- 7
-
House of Confession
BA(Hons) Drawings
Tags Computer Model, Detailing, Technical
- RIBA Level: Part 1
- Pieces: 14
- 0
- 109
-
Montserrat LAB
The aim of the project was to build a construction system instead of a final building, this would allow the building to adapt over time
Tags Visuals, Detailing, Technical
- RIBA Level:
- Pieces: 5
- 0
- 0
follow: